236 free guides, 79 of them scenarios

NEC help you can actually find

Type what happened, a clause number or a word you keep hearing. Plain-English answers written by planners who do this work every day.

Popular:Anywhere on the site: Ctrl K

Showing 236 of 236 guides

Start here

New to NEC?

Four short reads that explain what an NEC contract is, who does what and the words you will hear on site. Then come back and search for the thing that is bothering you.

  1. What an NEC contract is and what it expects from you on site3 min read
  2. NEC for beginners: who does what and how a problem is handled3 min read
  3. The parts of an NEC contract and which one answers your question4 min read
  4. The nine sections of NEC core clauses and where to look for what3 min read

NEC basics for newcomers

22 guides

New to NEC? What it is, who does what, and the words you will hear.

3 min read

What an NEC contract is and what it expects from you on site

A newcomer's definition of an NEC contract, the four habits it demands, and how to work out which version you have been handed.

Read the guide →
3 min read

NEC for beginners: who does what and how a problem is handled

A plain walk-through of the NEC roles and the first weeks of a job, with an invented culvert problem followed from discovery to payment.

Read the guide →
4 min read

The parts of an NEC contract and which one answers your question

Core clauses, Options, Contract Data, Scope and Z clauses: where each sits and how to trace one question through all of them.

Read the guide →
3 min read

The nine sections of NEC core clauses and where to look for what

A map of the NEC4 ECC core clauses, section by section, plus the NEC3 differences that catch out people using old templates.

Read the guide →
3 min read

NEC or JCT: how the two contracts treat delay, change and notices

How NEC differs from JCT for the party doing the work, with a worked example and what to change in your habits when you switch.

Read the guide →
3 min read

JCT words and their closest NEC equivalents

A translation guide from familiar JCT terms to NEC4 ECC terms, with the differences that catch out contractors moving across.

Read the guide →
3 min read

What NEC does well for contractors, and what each benefit depends on

The real strengths of NEC for the party doing the work, each paired with the condition that makes it happen, and what to ignore in sales talk.

Read the guide →
3 min read

NEC4 in plain English: what it is and how to tell if you are on it

A short definition of NEC4, what it changed from NEC3, and four quick checks to confirm which edition your contract actually uses.

Read the guide →
3 min read

NEC3 to NEC4: what changed and what trips up experienced teams

The practical differences between NEC3 and NEC4 ECC, including programme silence, payment applications and the final assessment, with one worked sum.

Read the guide →
3 min read

NEC4 renamed terms: Scope, Client and the rest of the new vocabulary

Which NEC3 words changed in NEC4, which stayed, and how to update templates and Z clauses without breaking anything.

Read the guide →
3 min read

The NEC mistakes that cost contractors money, and a weekly self-check

The most common procedural errors on NEC jobs, what each costs you, how to avoid it, and a five-question check you can run on Monday.

Read the guide →
4 min read

The NEC Project Manager: what they can decide and what happens if they go quiet

What the Project Manager can and cannot do under NEC, how far to trust them, and the protections you have when they stay silent.

Read the guide →
4 min read

The NEC Supervisor: tests, Defects and when their actions cost the Client

What the NEC Supervisor does and cannot do, how their actions create compensation events, and how to work with them on tests and Defects.

Read the guide →
4 min read

Your duties as the NEC Contractor, and the ones that quietly cost money

A working list of what the Contractor must do under the NEC4 ECC, grouped by build, time, quality and notices, with a pre-start checklist.

Read the guide →
3 min read

What the Client must do under NEC, and what it means when they do not

The Client's few direct duties under the NEC4 ECC, how failures become compensation events, and what to expect from a Client's staff.

Read the guide →
3 min read

NEC Contract Data: what it is and why one blank can cost you money

A plain guide to NEC Contract Data for contractors and subcontractors: what goes in it, which entries bite hardest, and what to check before you sign.

Read the guide →
3 min read

The NEC Scope: what it covers and what changes it

What the NEC Scope is, how a change to it becomes a compensation event, and how to avoid pricing the wrong thing.

Read the guide →
3 min read

NEC mutual trust and co-operation: what the clause really requires

What the NEC trust and co-operation clause means in daily practice for contractors and subcontractors, and what it cannot do for you.

Read the guide →
3 min read

NEC clause 13 communications: how to send a notice that counts

A plain walk through NEC clause 13: the form, timing and replies that decide whether your notice, submission or answer is valid.

Read the guide →
3 min read

NEC period for reply: which deadline applies and what a late answer costs

How the NEC period for reply works, which replies have their own deadlines, and when a late answer becomes a compensation event.

Read the guide →
3 min read

NEC Working Areas: why where your people sit affects what you recover

What NEC Working Areas are, the two tests they must pass, and how listing the right places in Contract Data protects your cost recovery.

Read the guide →
3 min read

The NEC Accepted Programme: the one programme that counts

What the NEC Accepted Programme is, why it is the baseline for delay and compensation events, and how to stop it drifting out of date.

Read the guide →

NEC Options and contract types

24 guides

Main Options A to E, secondary Options, Z clauses and which NEC form you are on.

4 min read

NEC Option A: fixed lump sums per activity, and what that means for you

How NEC Option A pays by completed activity, where the risk sits for the contractor, and the mistakes that cost money on an Option A job.

Read the guide →
3 min read

NEC Option B: paid by measurement against a Bill of Quantities

How NEC Option B pays rates times measured quantities, when a quantity change becomes a compensation event, and the mistakes to avoid.

Read the guide →
4 min read

NEC Option C: target contracts, Defined Cost and sharing pain and gain

How NEC Option C pays actual cost plus Fee against a target, how the share works, and what contractors must get right on records and compensation events.

Read the guide →
3 min read

NEC Option D: a target that moves with measured quantities

How NEC Option D combines remeasurement with target cost sharing, what it means for your payments and share, and when it fits.

Read the guide →
3 min read

NEC Option E: cost reimbursable contracts from the contractor's side

How NEC Option E pays Defined Cost plus Fee with no target, what controls the Client uses, and what you must still do on records and compensation events.

Read the guide →
3 min read

Which NEC main Option is this contract, and what does it mean for you?

Why Clients pick Options A to F, how each choice shifts risk and workload onto you, and what to check before you tender or sign.

Read the guide →
3 min read

How to build an NEC Activity Schedule that gets you paid on time

How to build and maintain an NEC Activity Schedule for Options A and C: sizing activities, tying them to the programme, and avoiding disputes.

Read the guide →
3 min read

The Bill of Quantities under NEC: what it does and does not do

How the NEC Bill of Quantities works under Options B and D, why it is not the Scope, and how to handle mistakes and measurement.

Read the guide →
4 min read

How target cost and your share of savings and overruns work in NEC

What the target is, how it moves, how your share is calculated and when it is paid, for contractors on NEC Option C or D.

Read the guide →
3 min read

Pain/gain share in NEC: what you keep and what you hand back

A plain walk through the contractor's share on NEC Options C and D, with a worked table and the point where your margin disappears.

Read the guide →
3 min read

NEC Option A or Option C: who carries your cost overrun?

Compare NEC Option A (lump sums) with Option C (target cost) from the contractor's side, with a side-by-side table and a worked overrun.

Read the guide →
4 min read

Which NEC contract form is this, and why was it chosen?

A practical guide to the NEC family of contracts: what each form is for, how to tell if the right one has been used, and what to check.

Read the guide →
3 min read

The NEC4 subcontract (ECS): what changes when you are the subcontractor

How the NEC4 Engineering and Construction Subcontract differs from the main contract: who is who, shorter periods, and how it ties to the job above.

Read the guide →
4 min read

NEC4 Short Contract (ECSC): when it fits and what it leaves out

What the NEC4 short form for works contains, what it drops compared with the full contract, and the traps for contractors working under it.

Read the guide →
3 min read

Back-to-back NEC subcontracts: matching the time periods above and below

Why NEC4 subcontract periods differ from the main contract, a worked timeline for a change, and where back-to-back quietly breaks.

Read the guide →
3 min read

NEC4 Term Service Contract (TSC): working on call-off maintenance

How the NEC4 Term Service Contract differs from the construction contract: Service Manager, Task Orders, the plan and the compensation events.

Read the guide →
4 min read

NEC Task Orders: how call-off work is instructed, priced and tracked

What an NEC4 Task Order contains, how it is priced, which events can follow, and a register to keep when you receive hundreds.

Read the guide →
3 min read

NEC Z clauses: what they are and how to read them before you sign

Z clauses are the extra conditions bolted onto an NEC contract. Learn what they are, when they are justified and how a contractor should test them.

Read the guide →
3 min read

Eight Z clause traps to spot before you sign an NEC contract

Common ways additional NEC conditions go wrong or quietly shift risk onto the contractor, with what to raise at tender.

Read the guide →
3 min read

NEC Option Y(UK)2: how it sets your payment dates and pay less rules

What Option Y(UK)2 does for payment timing, pay less notices and suspension, with a dated example and the NEC3 versus NEC4 numbering.

Read the guide →
3 min read

NEC Option W2: how adjudication works on a UK construction contract

The W2 dispute route explained for contractors: the timetable, the optional Senior Representatives step, and the four-week deadline that matters.

Read the guide →
3 min read

NEC Option X1 price adjustment: how inflation is paid on your contract

How X1 moves your prices with published indices on Options A to D, with a worked calculation and the traps around compensation events.

Read the guide →
4 min read

NEC Option X7 delay damages: what late completion will cost you

How X7 sets a daily rate for late Completion, how part take over reduces it, and how a later compensation event can reverse the damages.

Read the guide →
3 min read

How secondary Options are chosen on an NEC4 contract, and what they mean for you

A contractor's view of NEC4 secondary Options: which questions drive the choice, which combinations clash, and what each Option can cost your business.

Read the guide →

Tendering and starting a contract

12 guides

Contract Data, the first weeks, and setting up to manage an NEC contract.

2 min read

A guide to hiring a P6 NEC planner

What to look for when you need a Primavera P6 planner who understands NEC, the questions to ask, and when contract cover makes sense.

Read the guide →
5 min read

A Contract Data checklist for contractors before signing an NEC contract

The Contract Data entries a contractor should check before signing an NEC contract, from periods and Key Dates to Options and retention.

Read the guide →
Scenario5 min read

I have just won an NEC contract: what should I do in the first four weeks?

A practical four-week plan for a contractor that has just been awarded an NEC contract: programme, early warnings, communications, subcontracts and records.

Read the guide →
4 min read

Z clauses: how to read the amendments that change your NEC contract

How to read Z clauses in an NEC contract and what to look for in the time, payment, programme and compensation event provisions they change.

Read the guide →
4 min read

What programme you need at tender for an NEC contract

What a tender programme should contain for an NEC contract, and how it becomes the first Accepted Programme once the contract is awarded.

Read the guide →
4 min read

NEC contract kick-off meeting: who attends, what to agree and what to avoid

How to use a kick-off meeting to get your team and the Client's team running the same NEC procedures from day one, with an agenda and a live exercise.

Read the guide →
3 min read

A one-hour weekly routine for managing an NEC contract

A simple weekly hour that keeps NEC notices, replies, compensation events and the programme under control, with extra checks for each role.

Read the guide →
3 min read

NEC programme submission covering note and checklist you can copy

A plain covering note and checklist for submitting a first or revised NEC4 programme so the Project Manager finds it easy to accept.

Read the guide →
4 min read

Working as a contractor under NEC4: what to protect from tender to completion

A practical NEC4 guide for contractors new to the form: what to check at tender, the three things to protect on site, and the traps that cost money.

Read the guide →
4 min read

NEC4 for subcontractors: shorter clocks, and the main contractor in the middle

What a subcontractor on an NEC4 ECS subcontract needs to know: the shorter periods, who instructs you, how you get paid and what to check before signing.

Read the guide →
3 min read

Mutual trust and co-operation on NEC: turning clause 10 into daily habits

What clause 10 asks of you in practice, what it does not do for you, and how to build five or six specific behaviours into an NEC job.

Read the guide →
Scenario4 min read

You underpriced an NEC job: what you can and cannot change

Priced a job too low under NEC? Why it is not a compensation event, how each main Option treats the error, and what you can do this week.

Read the guide →

Programmes and time

23 guides

Building, submitting and defending an NEC programme.

3 min read

NEC Clause 31 programme checklist

A practical checklist of what clause 31.2 says your NEC programme must show, so it is not sent back at the first review.

Read the guide →
3 min read

Why NEC programmes are not accepted

The four grounds a Project Manager can use to refuse a programme under clause 31.3, and the practical mistakes behind each one.

Read the guide →
3 min read

P6 schedule health check using DCMA-style metrics

The 14 DCMA schedule quality checks explained, with typical thresholds and how to run each one in Primavera P6.

Read the guide →
4 min read

Float and time risk allowance explained

What float and time risk allowance mean under NEC, why clause 31.2 asks for both, and how they affect compensation events.

Read the guide →
3 min read

Revised programme submission timeline cheat sheet

When the Contractor must submit programmes under clause 31 and 32, how long the Project Manager has to reply, and what to diarise.

Read the guide →
3 min read

NEC3 versus NEC4: what changed for programmes

The differences between NEC3 and NEC4 that matter when you build, submit and manage a programme.

Read the guide →
3 min read

Delay analysis basics for NEC contractors

A plain-English introduction to the main delay analysis methods and how NEC assesses time on compensation events.

Read the guide →
Scenario4 min read

The Project Manager has not accepted my programme: what now?

What to do when your NEC programme is not accepted: check the reply, fix the stated reasons, resubmit and protect your position on time.

Read the guide →
Scenario4 min read

The Project Manager has not replied to my programme: what now?

A practical guide to chasing a silent Project Manager after a programme submission under NEC, including reply periods, records and escalation.

Read the guide →
3 min read

How to write a programme narrative and schedule of changes

How to write a short programme narrative and schedule of changes that explains your NEC programme and makes it easier for the Project Manager to accept.

Read the guide →
Scenario3 min read

My programme now shows we will finish late: do I submit it?

What to do when an updated NEC programme forecasts completion after the Completion Date: honest submission, causes, notices and records.

Read the guide →
5 min read

Key Dates and sectional completion explained for programme builders

How Key Dates and sectional completion work in an NEC programme, and how to build, show and protect them when planning and revising.

Read the guide →
4 min read

The Accepted Programme explained: which programme counts and why it matters

How a programme becomes the Accepted Programme under NEC, what it controls for delay and access, and the mistakes that leave contractors exposed.

Read the guide →
3 min read

Your first NEC programme: when it is due and how the 25% deduction works

When to submit your first NEC programme under clause 31.1, what ends the 25% payment deduction, and a practical order of work for getting it in.

Read the guide →
3 min read

When the Project Manager ignores your programme: treated acceptance under NEC4

How a silent Project Manager can end up with your NEC4 programme treated as accepted, the timeline, the steps to take and the open questions.

Read the guide →
4 min read

Terminal float under NEC: the time buffer at the end of your programme

What terminal float is, why NEC's delay rule protects it, what eats into it and how to show it honestly on your programme.

Read the guide →
3 min read

Acceleration under NEC clause 36: how a Client buys an earlier Completion Date

How NEC acceleration works for contractors: the quotation process in NEC3 and NEC4, what is not acceleration, and how to price a request.

Read the guide →
4 min read

How the programme measures delay from a compensation event

The step-by-step method NEC uses to turn a compensation event into extra time, with what goes wrong when there is no usable programme.

Read the guide →
4 min read

NEC access dates: when you can start on site and what happens if access is late

How starting dates and access dates work in NEC, the 'later of' rule that catches contractors out, and how late access becomes a compensation event.

Read the guide →
Scenario4 min read

Behind programme on an NEC contract: what to tell the Project Manager

What to say, in what order, when your NEC works are slipping: early warning, revised programme, and keeping any compensation event claim intact.

Read the guide →
Scenario4 min read

No accepted programme on an NEC job: how compensation events get assessed

What happens to time and money for a compensation event when the Project Manager has not accepted your programme, and how to fix the gap.

Read the guide →
Scenario3 min read

Client change used up our float: can we still claim under NEC?

When a compensation event eats float on your programme, what you can and cannot recover in time and money, and what to do before the notice window closes.

Read the guide →
Scenario4 min read

Missed an NEC Key Date: what it can cost you and how to limit it

What clause 25.3 lets the Client recover when you miss a Key Date, how to test the Project Manager's figure and what to do while the date is still ahead.

Read the guide →

Early warning and risk

17 guides

Spotting problems early, liabilities, insurance and risk allocation.

3 min read

Early warning register template

How early warnings work under NEC, what to record in the register, and a template you can copy.

Read the guide →
Scenario4 min read

I have noticed a problem that is not a delay yet: do I give an early warning?

When to give an NEC early warning, what it must cover, how to word it, and why giving one is almost always safer than waiting.

Read the guide →
4 min read

Running an early warning meeting that actually reduces risk

How to prepare, run and follow up an NEC early warning meeting so risks are owned, actions are recorded and the programme is protected.

Read the guide →
Scenario4 min read

I gave an early warning and the Client or Project Manager ignored it

What to do when an NEC early warning gets no response: follow up, record the position, mitigate, and protect your rights on time and cost.

Read the guide →
3 min read

What an NEC early warning is and when you must give one

A plain guide to the NEC early warning duty: what triggers it, who owes it, how it differs from a compensation event notice, and the cost of staying silent.

Read the guide →
3 min read

NEC early warning notice: wording you can copy

A ready-to-use early warning layout for NEC4 contracts with a filled-in example and notes on adapting it for NEC3, subcontracts and short forms.

Read the guide →
3 min read

What to raise as an NEC early warning: examples and a quick test

Practical examples of matters that need an NEC early warning, a four-question test for borderline cases and what does not need one.

Read the guide →
3 min read

Who has to give an NEC early warning: contractor, Project Manager, others

Who owes an early warning under NEC, who keeps the register and calls meetings, and how knowledge on site reaches the person who sends notices.

Read the guide →
3 min read

What if you do not give an NEC early warning? The cost explained

How a missing early warning reduces what you recover on a compensation event under NEC, the Disallowed Cost risk, and how to respond to a 61.5 statement.

Read the guide →
3 min read

Early warning mistakes that cost NEC contractors money

The most common errors in giving, writing and following up NEC early warnings, from silence to over-warning, with a simple fix for each.

Read the guide →
4 min read

How early warnings work for NEC subcontractors

Who a subcontractor warns, how warnings travel up and down the chain, and why the subcontract time limits are shorter than the main contract's.

Read the guide →
3 min read

What you are liable for as the contractor under NEC

The four things NEC makes the Contractor liable for, how they sit against the Client's list, what changed from NEC3, and insurance and subcontractors.

Read the guide →
3 min read

What the Client carries under NEC: the clause 80.1 list

The risks NEC puts on the Client, how taking over changes them, and how a Client liability becomes a compensation event for the contractor.

Read the guide →
3 min read

NEC insurance: what the contractor must arrange and prove

A plain guide to the Insurance Table, certificates, joint names, subrogation and excesses under NEC, with a start-of-job checklist.

Read the guide →
3 min read

Who carries the risk under each NEC main option

How cost, quantity and overrun risk shift between Options A to F, a worked comparison and the risks that stay the same whichever option you use.

Read the guide →
Scenario3 min read

Will an early warning be read as admitting we are at fault?

Why raising an early warning does not admit blame under NEC, and how to word one so it records the risk without handing the other side a weapon.

Read the guide →
Scenario3 min read

Does an early warning protect my compensation event claim?

An early warning and a compensation event notice are different documents. Learn why one does not cover the other and how to avoid the eight-week trap.

Read the guide →

Compensation events and change

50 guides

Notifying, quoting and assessing compensation events.

4 min read

Compensation event quotation: template and guide

What a clause 62 compensation event quotation must contain, how to price time and money, and a template you can adapt.

Read the guide →
7 min read

How to show a compensation event on the programme, step by step

A worked example with programme pictures: the Accepted Programme, progress to the dividing date, the event inserted, and the dates the quotation claims.

Read the guide →
7 min read

Concurrent delay and compensation events: how to deal with it, step by step

What concurrent delay means, why NEC's prospective method handles most of it, and how to assess time and money when your delay and the Client's overlap.

Read the guide →
4 min read

Compensation events in plain English: what counts under clause 60.1

A plain-English walk through the clause 60.1 list of NEC compensation events, grouped by category, so you can spot a valid event early.

Read the guide →
Scenario4 min read

Told on site to do extra work, nothing in writing: what to do under NEC

A Project Manager or Client's rep verbally asked for extra work. Here is how to protect your position and notify a compensation event.

Read the guide →
Scenario5 min read

Missed the eight-week compensation event deadline: is the claim lost?

What happens if you notify a compensation event after eight weeks, the exception when the Project Manager should have notified it, and what to do now.

Read the guide →
Scenario4 min read

Late Access to Site or Working Areas: What to Do Under NEC

The Client has not given access when your programme needs it. Steps to protect time and money, what to record and when to escalate.

Read the guide →
Scenario5 min read

Hit unexpected ground conditions: what to do under NEC

General guidance on unforeseen ground conditions under NEC: early warning, evidence, notifying a compensation event and why your Contract Data and Scope matter.

Read the guide →
Scenario5 min read

Project Manager rejected my compensation event quotation: what now?

What to do when the Project Manager rejects your NEC compensation event quotation or assesses the event themselves, and how to protect your entitlement.

Read the guide →
4 min read

Compensation event notification checklist: make it stand up

A practical checklist for NEC compensation event notifications covering timing, content, form, evidence and follow-up.

Read the guide →
3 min read

What a compensation event is and why it matters to your price and programme

A plain explanation of NEC compensation events: what they cover, how they replace variations and extensions of time, and a quick test for site events.

Read the guide →
4 min read

NEC4 compensation events listed one by one in plain English

All 21 core NEC4 compensation events in clause 60.1, plus the Option events, with who normally notifies each and how to read the list.

Read the guide →
4 min read

How a compensation event moves from notice to new price and date

The five stages of an NEC compensation event, the time limit at each stage and what you and the Project Manager must do, with a worked timeline.

Read the guide →
3 min read

Preparing an NEC compensation event quotation that gets accepted

What goes into a compensation event quotation, how to handle the programme and alternatives, and the mistakes that get quotations sent back.

Read the guide →
3 min read

What happens when the Project Manager does not reply: treated acceptance

How NEC treated acceptance works for compensation event decisions, quotations, assessments and programmes, with the notice you must send and the timings.

Read the guide →
3 min read

Revised quotations: why the Project Manager asks and how to respond

When a Project Manager can instruct a revised NEC quotation, what good reasons look like, how long it takes and how to reply without wasting three weeks.

Read the guide →
3 min read

When the Project Manager assesses a compensation event instead of you

The four situations in NEC clause 64 where the Project Manager assesses a compensation event, how long they have and what you can do if they fail.

Read the guide →
3 min read

Implementing a compensation event: when your price and dates actually change

How NEC clause 66 makes a compensation event final, what changes in your Prices and dates, and the checklist to close the event out properly.

Read the guide →
3 min read

Notifying a compensation event when you never gave an early warning

Yes, you can notify a compensation event without an early warning under NEC. Learn what it may cost you and how to run both notices together.

Read the guide →
4 min read

Seven worked compensation event examples for contractors

Seven invented NEC4 examples showing which clause applies, who notifies and how the result is worked out, including two events that fail.

Read the guide →
3 min read

The compensation event mistakes that cost contractors money

The common NEC compensation event errors made by contractors and Project Managers, what each costs and the habit that prevents it.

Read the guide →
4 min read

Stop-work and Key Date instructions as a compensation event (60.1(4))

How NEC clause 60.1(4) works when the Project Manager tells you to stop, hold back or re-date work, what to record, and how it is priced.

Read the guide →
4 min read

When the Client or third parties disrupt you: compensation event 60.1(5)

How NEC clause 60.1(5) works when the Client, a utility or another contractor works outside the programme or Scope, with evidence and a priced example.

Read the guide →
3 min read

Late Reply From the Project Manager: Compensation Event 60.1(6)

When a slow answer from the Project Manager or Supervisor becomes a compensation event, and what you need to prove before it is worth notifying.

Read the guide →
3 min read

Weather Under NEC: When Bad Weather Is a Compensation Event

How the one-in-ten-year weather test in clause 60.1(13) works, what to set up in Contract Data, and why most bad weather stays your risk.

Read the guide →
3 min read

Instructed Change to the Scope: Compensation Event 60.1(1)

What counts as a Project Manager instruction changing the Scope, the two exceptions, how it is priced, and the mistakes that cost contractors money.

Read the guide →
3 min read

Unexpected ground and site conditions: compensation event 60.1(12)

How the physical conditions event works, what you are taken to have known at tender, and how to prove only the excess is yours to claim.

Read the guide →
3 min read

Prevention: NEC's version of force majeure (clause 60.1(19))

What counts as a prevention event, why it is hard to prove, and how time and money are assessed when something outside both parties' control stops you.

Read the guide →
3 min read

When the Client Breaches the Contract: Compensation Event 60.1(18)

How the catch-all breach event works, which specific events to try first, and why it pays your cost and Fee rather than damages.

Read the guide →
Scenario3 min read

Late drawings: can you claim a compensation event?

Whether late Issued For Construction drawings give you a compensation event depends on who was meant to supply them and what the programme says.

Read the guide →
Scenario3 min read

Your own designer is late: who carries the cost?

If a designer you appointed delivers late, the delay is normally yours. Here is what to do now, who pays by main Option, and when a Client cause exists.

Read the guide →
Scenario3 min read

Project Manager replied late: is that a compensation event?

A late reply can be a compensation event under 60.1(6), but only a real effect on cost or dates earns you anything. Here is what to check and do.

Read the guide →
Scenario3 min read

Instruction received but no compensation event notified

The Project Manager gave an instruction that changes the Scope but did not notify an event. Here is how to notify it yourself and protect your position.

Read the guide →
Scenario3 min read

Does the time bar still apply if the PM should have notified?

The eight-week time bar is lifted only for events arising from the Project Manager's own communications. Knowing about an event is not enough.

Read the guide →
Scenario3 min read

Notifying a compensation event before it happens

You can notify an event you expect, not just one that has happened. When to do it, when to send an early warning instead, and the knock-on effects.

Read the guide →
Scenario3 min read

No reply to your compensation event notice: notify the failure

If the Project Manager stays silent on your notice, a failure notice starts a short clock after which the event is treated as accepted.

Read the guide →
Scenario3 min read

No reply to your quotation: using clause 62.6

How to turn a Project Manager's silence on your quotation into a treated acceptance, with the deadlines for the ECC and the NEC4 subcontract.

Read the guide →
Scenario3 min read

Cannot price the quotation yet: assumptions and risk allowances

When facts are unknown, ask the Project Manager for assumptions or price the risk, but never let the quotation deadline pass without submitting.

Read the guide →
Scenario4 min read

Pricing a compensation event for work you have already done

How to price a compensation event when the work is finished: what counts as actual cost, what must be forecast, and the evidence to gather.

Read the guide →
Scenario3 min read

Recovering the cost of extra time on site under NEC

NEC has no separate prolongation claim. See how time-related cost goes into the compensation event, what to include and what to leave out.

Read the guide →
Scenario3 min read

Recovering lost productivity (disruption) under NEC

How disruption is priced as part of a compensation event, the output records that prove it, and why you must put it in your first quotation.

Read the guide →
Scenario3 min read

Unmarked utilities on site: is it a compensation event?

What to do when you hit a service that wasn't on any drawing, and how the NEC test for unforeseen physical conditions is applied to it.

Read the guide →
Scenario3 min read

Contaminated ground found on site: your first steps and who pays

What to do when you uncover contamination, and how the NEC physical conditions test and the Site Information decide whether it is a compensation event.

Read the guide →
Scenario3 min read

Can you claim for bad weather under NEC?

Bad weather is a compensation event only if the recorded figures beat the one-in-ten-year test. How to check, what to log, and what stays with you.

Read the guide →
Scenario3 min read

Another contractor is holding you up: can you claim?

When delay by the Client's other contractors, utilities or authorities is a compensation event, and why your Accepted Programme usually decides it.

Read the guide →
Scenario3 min read

The Project Manager has told you to stop work: what next?

Obey the instruction, then protect your position. How an NEC stop work instruction becomes a compensation event, and when your own fault removes it.

Read the guide →
Scenario3 min read

The Client has changed its mind on the design: how you get paid

How a Client change of mind turns into an NEC instruction and compensation event, the proposed-instruction route, and what to do before you act.

Read the guide →
Scenario3 min read

New regulations mean extra work: who pays under NEC?

A change in law after the Contract Date: when Option X2 makes it the Client's cost, when it stays with you, and how to notify.

Read the guide →
Scenario3 min read

A permit or consent is late: who carries the risk under NEC?

NEC has no clause on permits. See how the Scope and the Accepted Programme decide whether a late permit is a compensation event.

Read the guide →
Scenario3 min read

Work is finished but compensation events are still open

How to close out unresolved compensation events after Completion: the cut-offs, who must act next, and how to avoid losing them in the final account.

Read the guide →

Communications and records

17 guides

Notices, instructions, time bars, registers and keeping evidence.

Scenario4 min read

An instruction conflicts with the Scope or the contract: what to do

You have been given an instruction that seems to contradict the Scope or the contract. How to query it, protect yourself and notify any compensation event.

Read the guide →
3 min read

What records to keep on an NEC contract: a practical checklist

A practical checklist of the records to keep on an NEC project and when to capture them, so programme, payment and compensation event claims hold up.

Read the guide →
Scenario4 min read

Notice sent by email, not the communication system: is it valid?

You emailed a notice but the NEC contract requires the communication system. What the clause 13 position is and how to fix it quickly.

Read the guide →
4 min read

Running NEC communications day to day: notices, logs and systems

A practical guide to clause 13: what counts as a valid communication, keeping notices separate, and the log that stops you losing an entitlement.

Read the guide →
4 min read

How to track NEC reply periods so deadlines never slip

Set up a tracker for NEC periods for reply: what to record, what each missed deadline triggers, and a worked example with dates.

Read the guide →
3 min read

NEC time bars: which deadlines really cost you the right

Which NEC deadlines are true time bars, which only reduce what you recover, the exceptions to the eight-week rule, and how to stay safe.

Read the guide →
4 min read

NEC time limits at a glance: the periods that catch contractors out

A quick-reference set of NEC time limits for notices, quotations, programmes, payment and completion, with the clause for each and the NEC3 differences.

Read the guide →
3 min read

Which registers to keep on an NEC contract, and what goes in them

The eight simple logs that let you prove what happened and when on an NEC job, with the fields to record and how to keep your list matching the Client's.

Read the guide →
3 min read

NEC letters that work: what each one should say

What every NEC letter needs, plus plain wording you can adapt for replies, chasers, defects, programme requests and extensions of time for a reply.

Read the guide →
3 min read

The forms and documents you need on an NEC contract

Which NEC documents come ready-made, which you must create yourself, who issues each one and what a notice or certificate must do to be valid.

Read the guide →
3 min read

Is a spreadsheet enough to run an NEC contract?

When a spreadsheet works for tracking NEC notices and replies, how it fails, and the safeguards that make one reliable, including a simple reply date formula.

Read the guide →
3 min read

Keeping NEC records that will stand up when it matters

Which records to keep on an NEC job, who should own them, what makes a record usable as evidence, and the extra records cost-based options demand.

Read the guide →
Scenario3 min read

Your request for information has gone unanswered: what to do under NEC

How to turn an ignored RFI into something the NEC contract recognises, protect your programme, and decide whether a late answer is worth a compensation event.

Read the guide →
Scenario3 min read

Someone told you to change the work out loud: can you start?

What to do when the Project Manager gives a verbal instruction under NEC: get it in writing, protect your compensation event, handle urgent safety work.

Read the guide →
Scenario3 min read

Client staff are giving your site team orders: how to handle it under NEC

What to do when the Client instructs your site team directly instead of through the Project Manager, and how to protect your time and money.

Read the guide →
Scenario3 min read

Drawings say one thing and the specification another: who wins under NEC?

What to do when NEC contract documents conflict, how the Project Manager's ruling is priced, and why the reading that favours you can matter.

Read the guide →
Scenario3 min read

The Project Manager is paid by the Client: can you expect fair decisions?

How far an NEC Project Manager has to act by the book rather than for the Client, and what to do if you think decisions are being steered.

Read the guide →

Payment and cost

27 guides

Applications, certificates, Defined Cost and getting paid.

5 min read

How payment works under NEC

How assessment dates, the Project Manager's certificate and payment periods work under NEC, and what the Construction Act adds on top.

Read the guide →
Scenario5 min read

I have not been paid on time: what to do under NEC

Step-by-step help if a payment under your NEC contract is late: check the dates, record it, claim interest, escalate, and know when to take legal advice.

Read the guide →
Scenario4 min read

The Project Manager assessed my payment too low

What to do when the Project Manager's assessment is far below your expectation: compare, query in writing, evidence the gap and escalate under NEC.

Read the guide →
4 min read

Defined Cost, Fee and Disallowed Cost explained

Defined Cost, Fee and Disallowed Cost in plain English for NEC Options C to F: what they mean, how they link, and how to avoid cost being disallowed.

Read the guide →
Scenario4 min read

Can I be paid for materials and Plant on site or stored off site?

How NEC treats payment for Plant and Materials delivered to site or held off site: what to check in the Contract Data, ownership, and how to apply.

Read the guide →
3 min read

The Schedule of Cost Components: what you can and cannot charge on cost-based NEC

How the Schedule of Cost Components decides what counts as Defined Cost on NEC Options C, D and E, and what falls into your Fee instead.

Read the guide →
3 min read

How the NEC fee percentage works, and what it has to cover

What the NEC fee percentage pays for, how NEC4 and NEC3 differ, where it applies by main Option, and a worked example of blending one percentage.

Read the guide →
3 min read

Price for Work Done to Date: the figure your NEC payment starts from

How the Price for Work Done to Date is worked out on each NEC main Option, why Options A and B reward finished activities, and why C, D and E use a forecast.

Read the guide →
3 min read

The NEC payment cycle in days: from assessment date to money in the bank

A day-by-day view of the standard NEC4 payment cycle for main contracts and subcontracts, with a dated example and the holiday traps.

Read the guide →
3 min read

NEC assessment dates: when your payment is worked out

How assessment dates and the assessment interval set your payment cycle, who chooses the first one, and how to avoid losing a month's cash.

Read the guide →
3 min read

How to submit an NEC payment application

What to put in an NEC4 payment application, what happens if you send it late, and a checklist to use before every submission.

Read the guide →
4 min read

Pay less notices under NEC: deadlines, content and who can send one

What a pay less notice must say, the seven-day deadline under Option Y(UK)2, and what happens to the payer who misses it.

Read the guide →
3 min read

The NEC4 final assessment and the four-week window to challenge it

How the NEC4 final assessment settles the final account, when it becomes conclusive, and the dispute deadlines you need in your diary.

Read the guide →
3 min read

Open book on NEC cost contracts: the records you must keep

What open book means on NEC Options C, D and E, which records clause 52.2 expects, and how to set up cost codes and monthly reporting.

Read the guide →
3 min read

NEC payment mistakes that cost contractors money

The payment errors that most often cost NEC contractors and subcontractors cash, grouped by stage, each with a practical fix.

Read the guide →
3 min read

How NEC subcontractors get paid: periods, dates and cash flow

The certification and payment periods in the NEC Engineering and Construction Subcontract, lining them up with the main contract, and late payment.

Read the guide →
4 min read

Retention under NEC: when it applies and when you get it back

How NEC retention under Option X16 works, with a worked example, the release trigger, retention bonds and the points contractors often miss.

Read the guide →
4 min read

NEC delay damages: how they are charged, reduced and repaid

How Option X7 delay damages work in the payment cycle, what happens when the Completion Date moves or part of the works is taken over, and common errors.

Read the guide →
Scenario4 min read

Can you recover a sharp rise in material prices under NEC?

A material price rise is not a compensation event. See whether Option X1 helps, how each main Option shares the cost, and what to do now.

Read the guide →
Scenario4 min read

Delay damages deducted from your payment: how to check and challenge them

A checklist for testing a delay damages deduction under NEC Option X7, plus the steps, evidence and reply letter that put a wrong figure right.

Read the guide →
Scenario4 min read

The Client missed the pay less notice deadline: what you can do

What a missed pay less notice means for payment under NEC Option Y(UK)2, how to check the dates, and how to protect your position.

Read the guide →
Scenario4 min read

The Project Manager disallowed your costs: how to respond

How to challenge Disallowed Cost on an NEC cost-based contract by matching your reply and evidence to the exact reason the Project Manager gives.

Read the guide →
Scenario4 min read

Missing cost records on an NEC cost contract: how to rebuild them

What to do when records for Defined Cost are missing on NEC Options C, D or E: where substitute evidence comes from and where to draw the line.

Read the guide →
Scenario3 min read

Heading over target on an NEC Option C contract: what to do

What happens when costs run above the target on NEC Option C, and five practical actions that can cut the share you end up paying.

Read the guide →
Scenario3 min read

Can you add head office overheads to an NEC price or compensation event?

Why head office overheads cannot be added as a separate line under NEC, how the Fee percentage covers them, and how to price a delay without losing money.

Read the guide →
Scenario3 min read

When does NEC retention come back to you?

How retention is released under Option X16, the two release points, how NEC3 and NEC4 differ, and what to diarise so the money actually arrives.

Read the guide →
Scenario3 min read

What to do if you disagree with the NEC final assessment

Four weeks decide whether you can challenge the final assessment under NEC. Learn the clock, the referral route and what to put in writing.

Read the guide →

Subcontractors and supply chain

14 guides

Working under or letting NEC subcontracts.

4 min read

NEC subcontracts explained: ECS, the short subcontract and how they link to the main contract

How NEC subcontracts work, who acts as Project Manager at subcontract level, and what flows down from the main Engineering and Construction Contract.

Read the guide →
Scenario4 min read

Subcontractor asked to do extra work with no written instruction

What to do as an NEC subcontractor when the main contractor asks for extra work without a written instruction, and how to protect your payment and time.

Read the guide →
Scenario4 min read

Subcontractor not paid by the main contractor: what to do

What an NEC subcontractor should do when the main contractor has not paid, including pay-when-paid, interest and Construction Act rights in general terms.

Read the guide →
Scenario3 min read

Subcontractor delayed by the main contractor or other trades

What an NEC subcontractor should do when late access, other trades or the main contractor's delays stop you working, and how to protect time and cost.

Read the guide →
4 min read

Time bars for subcontractors: your own deadlines under an NEC subcontract

Why a subcontractor's notification periods come from the subcontract, not the main contract, and how to track the deadlines that can cost you money.

Read the guide →
Scenario4 min read

My NEC subcontractor is behind programme: what the main contractor should do

How a main contractor should respond when an NEC subcontractor falls behind programme: protect your main contract dates and your rights against them.

Read the guide →
Scenario4 min read

My subcontractor says there has been a compensation event

How a main contractor should handle a subcontractor's compensation event notification: check it, respond in time, assess it and pass it up the chain.

Read the guide →
5 min read

Preparing an NEC subcontract package: what the Contractor should include

What a main contractor should include in an NEC subcontract package, from Subcontract Contract Data to scope, programme requirements and Z clauses.

Read the guide →
3 min read

How to run NEC subcontracts so the timings line up

A main contractor's guide to keeping subcontract and main contract clocks aligned under NEC4, with a period comparison table and a simple weekly routine.

Read the guide →
Scenario3 min read

Do you need the Project Manager's acceptance before appointing a subcontractor?

Yes, under clause 26. See what to submit, the reasons a refusal can rest on, and the risk if you have already appointed the firm.

Read the guide →
Scenario3 min read

Subcontractor reported a compensation event late: can you still claim from the Client?

Two contracts run two clocks. Learn which dates to check, what you can recover upstream and how to reply to a late subcontractor notice.

Read the guide →
Scenario3 min read

Using a non-NEC subcontract under an NEC main contract

Using your own or the subcontractor's terms below an NEC main contract is allowed, but the mismatches become your risk. Here is what to check.

Read the guide →
Scenario3 min read

Who should a subcontractor send an early warning to?

A subcontractor's early warning goes to the main contractor, not the Project Manager. Learn how to word it, what it must cover and what it does not replace.

Read the guide →
Scenario3 min read

Main contractor says it will pay you when the Client pays: is that allowed?

Pay when paid is normally ineffective under the Construction Act unless the payer is insolvent. See the dates, the pay less notice rules and your options.

Read the guide →

Defects, quality and completion

11 guides

Tests, Defects, Completion and take over.

5 min read

Defects under NEC: how the process works in plain English

A plain-English walk through how NEC handles Defects: the Supervisor, notifying, correcting, the Defects Date and what happens to uncorrected Defects.

Read the guide →
Scenario4 min read

The Supervisor has notified a Defect I disagree with: what to do

Step-by-step guidance for a Contractor who thinks a notified Defect is not a Defect: respond in writing, protect your position and keep working.

Read the guide →
Scenario4 min read

The Client wants to use or take over part of the works before Completion

What a Contractor should do when the Client wants to use or take over part of the works early: defects, damage, insurance and the programme.

Read the guide →
5 min read

Completion, take over and the Defects Date explained

How Completion, take over and the Defects Date fit together under NEC, why they matter for payment and risk, and what to check in your contract.

Read the guide →
Scenario4 min read

The Project Manager will not certify Completion

What to do if the works are finished but the Project Manager will not certify Completion: check the definition, record the facts, ask in writing, escalate.

Read the guide →
3 min read

How tests and inspections work under NEC

What the NEC test and inspection clause covers, the notice you must give, the three compensation events linked to testing and who pays for a repeat test.

Read the guide →
3 min read

What the NEC Defects Certificate is and what follows from it

The Defects Certificate lists uncorrected Defects or says there are none. See when it is issued, what it triggers and what it does not release.

Read the guide →
3 min read

Designing under an NEC contract: what you must submit and what you stay liable for

How contractor design works under NEC clauses 21 to 23, why acceptance does not move liability, and what Option X15 changes.

Read the guide →
Scenario3 min read

Who pays when a defect appears after Completion but before the defects date?

Work out whether it is a Defect, who must fix it, the notification and correction clock, and how each main Option treats the cost.

Read the guide →
Scenario3 min read

A test failed on site: who pays for the repeat?

Whether you or the Client pays for a failed NEC test depends on the cause. Learn the clauses, the cost rules by main Option and what to record.

Read the guide →
Scenario3 min read

Your design has been rejected by the Project Manager: next steps

How to sort valid from invalid reasons for a refused NEC design, what clocks start, and when a rejection becomes a compensation event.

Read the guide →

Disputes and termination

12 guides

When things go wrong and how the contract deals with it.

4 min read

Adjudication under NEC: how it works and how to prepare

A general guide to adjudication under NEC: when it is available, how it runs, when to use it, and how to prepare a strong referral.

Read the guide →
Scenario5 min read

The Client has said they will terminate: what to do under NEC

What to do if the Client says they will terminate, or serves a termination notice: check the reason and procedure, protect your position, get advice fast.

Read the guide →
4 min read

How to stop a disagreement becoming a dispute under NEC

Habits that stop NEC disagreements becoming formal disputes: early warnings, timely notices, honest programmes, records and the right conversations.

Read the guide →
4 min read

How NEC disputes are resolved: the routes, the people and your first steps

A newcomer's guide to NEC dispute routes (W1, W2, W3): who decides what, how to find your route and what to do in the first days.

Read the guide →
5 min read

NEC dispute deadlines under W1 and W2, with a diary method

The deadlines that apply when you dispute something under NEC W1 or W2, in NEC3 and NEC4, plus the final assessment windows and a simple way to diarise them.

Read the guide →
4 min read

How termination works under NEC: notice, certificate and what you are paid

How NEC termination works for a contractor: the notice and certificate, how the Termination Table sets the money, and what to check before anyone serves notice.

Read the guide →
4 min read

What happens to an NEC contract when the other side goes insolvent

How NEC treats insolvency (reasons R1 to R10), what you are paid, the legal limit on suppliers terminating, and how to protect yourself before trouble starts.

Read the guide →
4 min read

Ending an NEC subcontract: how it links to the main contract

How termination works in an NEC subcontract: the R23 reason when the main contract ends, shorter periods, and what each party should check.

Read the guide →
Scenario5 min read

Work stopped for months: can you terminate the NEC contract?

When a stop instruction has dragged on, here is the test for terminating under clause 91.6, the weeks to count, and how the reason sets what you are paid.

Read the guide →
Scenario4 min read

Can you walk away from an NEC contract? The contractor's termination rights

The few reasons that let a contractor end an NEC contract, the waiting periods, what you are paid, and the steps and risks to weigh before serving notice.

Read the guide →
Scenario4 min read

You missed the NEC dispute deadline: can you still refer?

What a missed dispute deadline means under W1 and W2, which other time limits can still catch you, and how to check where you stand before doing anything else.

Read the guide →
Scenario4 min read

Adjudicate now or keep talking? How to choose under NEC

How to decide between adjudication and negotiation on an NEC contract: check running deadlines first, then weigh the evidence, the sum and the relationship.

Read the guide →

NEC by sector

7 guides

How NEC is used on water, wastewater, utilities, tunnelling, highways, rail and energy work.

4 min read

Working under NEC on water and wastewater projects

Practical NEC contract points for water work: live assets, outages, buried structures and ground, weather, commissioning, with a worked outage example.

Read the guide →
4 min read

Working under NEC on highways schemes: road space, utilities and sections

Practical NEC points for highways contractors: road space bookings, utility diversions, unknown services, weather, phased opening and term maintenance.

Read the guide →
4 min read

Working under NEC on rail projects: possessions, Key Dates and commissioning

How NEC treats rail access windows, lost possessions, urgent decisions, testing and commissioning, with a worked example and the records to keep.

Read the guide →
4 min read

Working under NEC on energy and nuclear projects: quality, change and long contracts

Practical NEC points for energy and nuclear work: quality plans, hold points, changing requirements, choice of Option, and keeping records over many years.

Read the guide →
3 min read

NEC on tunnelling projects: what to plan for

How NEC contracts meet the realities of tunnelling: ground risk, long linear programmes, shafts, third parties and the pressure points to plan around.

Read the guide →
2 min read

NEC on utilities projects: working with diversions, networks and third parties

How NEC contracts behave on utilities work: network outages, diversions, third-party dependencies, permits and the pressure points to plan around.

Read the guide →
3 min read

NEC on wastewater projects: plant, outages and commissioning

How NEC contracts meet wastewater work: live treatment works, outages, process commissioning, ground and third parties, and where to plan carefully.

Read the guide →
NEC guides and scenarios, searchable | CPMP