18 experienced planners · two directors · one point of contact

Planners who keep your programme accepted, honest and on time.

CPMP embeds experienced Primavera P6 and NEC planners with contractors and subcontractors, from two days a month to a full PMO team. No salaries, licences, vehicles or IR35 exposure, just the programme done properly.

NEC3 · NEC4 · JCTDirectors led, site trainedReplies within one working day

Trusted by contractors and clients including

CMDP, a Costain-MWH joint venture
Costain
Balfour Beatty
Bechtel
BAM Nuttall
Joseph Gallagher
London Underground
Ferrovial
Southern Water
Thames Water
Crossrail
AMEC
Anglian Water
McLaren Construction Group
ALS Civil & Mechanical Engineers
Davey Civils
Econotech
IDE Technologies
R&B Engineering
Clancy
CMDP, a Costain-MWH joint venture
Costain
Balfour Beatty
Bechtel
BAM Nuttall
Joseph Gallagher
London Underground
Ferrovial
Southern Water
Thames Water
Crossrail
AMEC
Anglian Water
McLaren Construction Group
ALS Civil & Mechanical Engineers
Davey Civils
Econotech
IDE Technologies
R&B Engineering
Clancy

Three ways to work with us

Scale planning up and down with the job, without carrying the overhead.

A team in days, not months

Surge capacity

A dedicated team to deliver a tender programme, set up a PMO or build a recovery schedule against a hard deadline, then stand down.

  • Tender and bid programmes with 4D where it wins work
  • PMO and P6 set-up on new frameworks
  • Recovery and acceleration programmes
  • Scales from one planner to a full team
How it works
Fixed scope, fixed fee

One-off specialist work

Forensic delay analysis, claims and expert reports, NEC programme acceptance reviews, P6 implementation and training.

  • Forensic delay analysis and EOT claims
  • Expert witness reports
  • Rebuilding a rejected programme
  • P6, CEMAR and NEC training for your team
How it works

Why contractors choose CPMP

Senior planners who have stood on the tunnel face, not just in front of the Gantt chart.

Both directors came up through site engineering and still plan every week. That shows in programmes that get accepted first time and in delay analysis a Project Manager cannot wave away.

18experienced planners
2directors who still plan
20+years in UK civils
7sectors covered

Directors who still plan

Both directors came up through site and still run programmes. You get senior judgement, not a junior with a licence.

Flexible without the overhead

No salaries, software licences, vehicles or IR35 exposure. Scale from two days a month to a full PMO team and back.

Programmes that get accepted

We build to clause 31.2, keep the critical path honest and write the narrative, so the Project Manager has no reason to refuse.

Delay analysis grounded in site

Forensic analysis (BTEC Level 7) by people who have been the engineer on the tunnel face, not just the analyst in the office.

The tools your client uses

Primavera P6, Synchro 4D, Asta, MS Project, CEMAR, AutoCAD and Revit, in whatever format the contract demands.

A network when it is not us

If a job needs a skill we do not carry in-house, we know who does, and we will say so.

A Six Sigma mindset

Led by a Six Sigma Black Belt: we cut the waste and the risk out of how the programme is run, and measure the result.

Led by two directors

You deal with the people who do the work.

CPMP is 18 planners led by Shane Stanford and Ben Cluer. Shane leads delay analysis, claims and P6 implementation; Ben runs the site-based teams across the South East.

Co-owner and director

Shane Stanford

Six Sigma Black Belt planning manager and delay analyst with over 20 years in UK civil engineering. Shane has planned and engineered the A3 Hindhead Tunnel, Crossrail at Farringdon, Vauxhall Station step-free access, water and wastewater schemes and a run of academy builds with Balfour Beatty.

Co-owner and director

Ben Cluer

Ben has been a planning engineer since 2001, at National Grid, Thames Water and the planning consultancy 4D before running his own practice from 2015 and co-founding CPMP in 2020. He leads CPMP's planning teams on the ground across the South East, including the site-based planners embedded on a major water and wastewater framework.

Tell us what is going wrong with the programme. We will tell you straight whether we can help.

Two minutes to brief us. A director reads every brief and replies within one working day.